Recently completed: West Ham Bus Garage

Client: Mansell Construction
Architect: Pringle Richard Sharratt
Value to BKTS: £1m
Materials: Curved Glulam and tubular structural steelwork
Quantities: 287m3 curved Glulam and 420 tonnes of tubular structural steelwork

New bus garage maintenance facility for London Transport to assist with the increase for the public transport for the 2012 Olympic Games.
Large tubular A frames core of building.
Neat single steel pin connections.

< Back to headlines

Downloads

site by Harris Associates

© B & K Timber Structures | A trading division of B & K Steelwork Fabrications Limited.