New contract win: Holy Trinity School
Client: London Borough of RichmondArchitect: Shepheard Epstein Hunter
Engineer: Techniker
Main Contractor: Apollo Group Ltd
This panel design system is due on site in May 2010 and encompassed 15 cu m of glulam, 3,500 square metres of X-LAM, along with five tonnes of steelwork.
< Back to headlines